Supply and installation of continuous welded rail for Metrolinx’s Stouffville Rail Corridor.

 

The Project

LRT Construction: A&B Rail Services was hired as a subcontractor to supply and install continuous welded rail for Metrolinx’s Stouffville Rail Corridor in Toronto, ON. The scope of this project included installation of #20 crossover switches, continuous welded rail and such required duties as welding, destressing, removal and dismantling of old switches, track surface, line and stabilize. A&B Rail Services also provided crews to simultaneously complete the installation of crossover switches and track on CP Rail’s Galt subdivision mainline track.

 

Deliverables:

  • Handling and unloading of all the track material
  • Construction of:
    • #20 crossover switches
    • Continuous welded rail
    • The Result
  • Welding, de-stressing, removal and dismantling of old
    switches
  • Track surface, line, and stabilize
  • Installation of crossover switches and track on CP Rail’s
    Galt subdivision mainline track

 

The Result

A satisfied client and another quality project completed. The successful completion of a project of this size is an excellent example of A&B Rail Services project management expertise, capabilities, and commitment to Doing It Right. There were a number of significant challenges which arose during this project that A&B Rail Services was able to overcome. Some of these included maintaining an aggressive timeline, sharing workspace with a number of other contractors, and ensuring all required resources were on hand to meet the client’s needs. As the safety of our team, our client, and the public has always been A&B Rail Services’ number one priority, procedures and systems were put in place to ensure all goals and safety standards were met. For A&B Rail Services, it means another satisfied customer in our 50-year journey to become Canada’s largest, most-experienced, and most sought-after rail services company.